top of page
Co-location BESS in Erkelenz

BESS meets solar power

In Erkelenz, NRW Germany, a scalable Battery Energy Storage System (BESS) is being implemented in co-location with a photovoltaic plant. This integrated facility combines renewable energy generation with grid-supporting storage technology, actively contributing to grid stabilization and to the efficient on-site utilization of solar energy.

Technical data

Power: 3 MW

Capacity: 9 MWh

Location: Erkelenz, Heinsberg district (North Rhine-Westphalia)

Commissioning: December 2025

bottom of page